Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Hebei Xingtai Maosen Foam Plastic Co., Ltd.

Reinforcement materials for mining, Roxu for mining, Malisan for mining

sell
  • There is no classification
contact
  • Contact:孟经理
  • Phone:0319-4986654
search
 
link
  • There is no link yet
home > sell > Safe filling materials, mining reinforcement materials, industry-leading quality, fast delivery
Safe filling materials, mining reinforcement materials, industry-leading quality, fast delivery
products: Views:6Safe filling materials, mining reinforcement materials, industry-leading quality, fast delivery 
brand: 茂森
price: 10000.00元/吨
MOQ: 1 吨
Total supply: 10000 吨
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-06-22 09:40
 
Details
The meaning of Malisan
- Malisan is a polyimide gel material with low viscosity. When water blocking is carried out, the resin and catalyst are mixed together and react or expand when exposed to water, react or foam to form a multi-element network dense elastomer. When it is pushed by high pressure and injected into the coal rock layer or concrete cracks (under the action of high pressure, the closed cracks in the coal rock layer can be opened), it can be extended along the coal rock layer or concrete cracks until all cracks (including cracks and cracks that are difficult to detect with the naked eye) are Filling of cracks that reopen under high pressure). When sealing cracks and strengthening coal strata, when the coal stratum does not contain water, the expansion rate of the product will be correspondingly smaller (the expansion multiple is
.
. ~
.
. times). The high-pressure thrust will Malisan is pressed into and fills all gaps to stop leakage.
.
- Malisan construction technology
.
- Malisan construction technology: drilling
.
. Burying grouting pipes
.
. Install the sealer
.
. Use a high-pressure hose to connect the injection gun and grouting pump
.
. Insert the two straws into the Mary Powder resin and
. Catalyst
. In the barrel
. />. Stop the pump
.
. Disassemble the injection gun.
.
. Use a pneumatic drill set to drill the hole diameter
.
. Hole depth
.
.
.
. The amount of grouting for each hole is determined according to the grouting pressure. During construction, the grouting pressure must be strictly controlled. When the grouting pressure reaches
.
. or a large area of grout leakage occurs ( When the amount of grout leakage
.
. The injection amount of the pump), you can change the hole for grouting or stop grouting.
.
. Grouting sequence: proceed from bottom to top.
.
Request for quotation
A total of0articles  Related Comments: